Monday, February 07, 2011

February Neighborhood Meeting

February 14th - 7 PM - Columbia Pioneer School @ Bridgeton and Marine Dr

AGENDA
:

Flood Zone for houses on the Levee

Dave Hendricks from MCDD will discuss the issues

CRC—What Now!!!

Environmental Evaluation of the Sloughs/West Hayden Island

Spring Clean-up ---April 23rd

Bridgeton Neighborhood Updates

Neighborhood Night out plans

Form a committee to work on a neighborhood disaster response plan

Tuesday, January 11, 2011

Columbia River Crossing Updates

Portland Working Group recommends elevated Hayden Island light rail station

The Portland Working Group (PWG) has recommended an elevated station for the new light rail stop on Hayden Island.

PWG members and CRC staff discussed both elevated and street level options late last year at an open house with 85 attendees. An online survey was also used to gather input on the design of the Hayden Island station.

The PWG and project staff are now moving forward with discussion and design detail of the elevated station, connections to local businesses and the local street network. Check the CRC website for future meeting materials and agendas. PWG next meets Jan. 12 at the Jantzen Beach SuperCenter from 4 to 6 p.m..

Project Sponsors Council receives update on Bridge Expert Review Panel work

CRC Bridge Expert Review Panel chair, Tom Warne provided an overview of the panel’s work at the Dec. 10 meeting of the Project Sponsors Council. The panel was convened by the Oregon and Washington departments of transportation to re-evaluate river bridge types and configurations for the CRC in response to a recommendation made by the CRC Independent Review Panel.

The panel will analyze all applicable river crossing options, including those that may have been dropped from consideration in the past and re-evaluate project constraints. The panel is expected to have a final report in January 2011. Additional information on the bridge panel is available online.

In-water soil study concludes in North Portland Harbor and Columbia River


The Columbia River Crossing project recently finished drilling work in North Portland Harbor and the Columbia River to gather additional information on soil type and stability to help advance bridge foundation designs.

Since beginning in November, drilling work was conducted at about 20 sites. The CRC project includes a replacement crossing for the Interstate Bridge over the Columbia River and new bridge structures between Hayden Island and Marine Drive. Supports for the structures are being designed to extend through the sandy river bed to solid ground or rock.

Additional information is available online.

Columbia River Crossing contact information

Email: feedback@columbiarivercrossing.org

Mail: 700 Washington St., Suite 300

Vancouver, WA 98660

Phone: 360-737-2726 or 503-256-2726

Fax: 360-737-0294

www.ColumbiaRiverCrossing.org

Tuesday, October 13, 2009

BNA Minutes form September 14th

14 Sep 09

BNA meeting at school w/18 in attendance

Leslie opened the meeting at 7:00 PM and introduced Adam Zucker and Bob Eaton from MCDD and Dick Shaffer from Pen #2. They presented detailed information and responded to questions from the attendees. Briefly, after the New Orleans flood, the Corp of Engineers rated levees around the nation beginning with the Columbia River. The Columbia River levee rated favorably between the Sandy and Willamette rivers.

Improvements are planned to improve the overall rating. An upcoming bond measure to pay for levee improvements was described. It uses current levee funding to pay off the bond so no increase is under consideration.

MCDD is working closely with CRC to coordinate levee issues with the overall bridge design. The annual meeting of Pen #2 is 3 Dec 09. Proxy votes are used to elect Pen #2 board members to represent the people living in the Pen #2 boundaries and to vote on any bond measure. Proxy cards need to be signed by the property owners and given to the representatives designated on the proxies prior to the annual meeting of Pen #2.

The CRC presentation by Peter Ovington was limited to the subject of bridge tolls. Tolls are a fact, says Mr. Ovington. While many in the audience disagree with the need for or length of tolls, there are really two toll questions. How high will the toll be? Where will the toll booth be located?

The variable by time of day toll range presented by Mr. Ovington was from $1 to $10 per trip. The tool booth may be located either before or after exit 308, Hayden Island. Toll will be collected by a radio transponder that reads a signal from each car that passes. Transponder-less cars will be photographed and a bill sent to the vehicle owner.

Mr. Ovington informed attendees that portions of the community favor tolling the existing I-5 bridge ASAP. Tolling the Glen Jackson I-205 bridge ASAP is also considered highly desirable.

The ODOT CRC engineer will be back to present at the November BNA general meeting.

Fall cleanup is scheduled for Saturday, November 7th.